1. Oil reservoir
  2. Hydraulic steering oil pump
  3. Assemble mount
  4. Assemble valve and piston
  5. 5/8 R6 hose from reservoir to oil pump. Fasten hose clamps
  6. Return hose from lift to reservoir 3 / 8 R6
  7. Pressure hose from oil pump to lift 5/16 R1
  8. Assemble tie rod
  9. After that center the valve shaft and fasten with M8 bolts
  10. Use special sae 10 or 20 (1 lt.) start engine, check oil level and add some more id necessary, check fastening bolts and hoses after 1 week
  11. The adjusting screw og the pressure valve
Back